Nothing on this page needs the owner right now. You're viewing as Owner / Developer · Meridian Capital.
Watch list

What's starting to go wrong.

Three things caught early — before tenants notice. Sorted by what it costs you if you wait.

Inspections & warranty deadlines

Meridian One · Chiller Plant A

Inspect the chiller on Nov 5. Confirm whether repair or replacement is the right next step.

Responsible: R. Alvarez · Last inspection Sep 18, 2026

View record

Meridian One · Fire alarm system

Fred to confirm the annual test appointment and attach the signed report.

Responsible: Fred Morgan · Last inspection Nov 12, 2025

View record

Cascade Union · Passenger elevators

Arrange the annual elevator inspection and upload the signed certificate. Continue routine maintenance.

Responsible: L. Ortiz · Last inspection Oct 14, 2025

View record

Fort Point Mills · Chiller 1

Arrange a service check before Dec 15 and confirm any covered repairs with the supplier.

Responsible: Dana Reed · Warranty ends 2026-12-15

View record
High risk · 82% chance of failure within 12 monthsPM · R. Alvarez is booking a vendor inspection

Dallas · Meridian One — Chiller Plant A

The unit that cools floors 1–22 is running rough and getting worse each week.

Cost of waiting
$780K if it dies during peak cooling demand
Cost to act now
$8K inspection now
Why we're flagging it
  • •Vibrating 38% more than normal — trend is worsening
  • •3 breakdowns in 15 months · $61K already spent patching it
  • •Units this age and model fail 3.2× more than the rest of your portfolio
  • •Tenants feel nothing yet — inspection needed before the next cooling season
Medium risk · 44% chance of failure within 12 monthsPM · D. Chen is requesting a plumber quote

Phoenix · Riverside Tower — Cooling tower

Water use jumped 22% over the same week last year — most likely a slow leak.

Cost of waiting
$95K in water bills + city fines
Cost to act now
$14K repair
Why we're flagging it
  • •2 leak-related work orders since spring
  • •City flags abnormal water use after 60 days
  • •Cooling load doubles in June — small leaks become big ones
Low risk · 21% chance of failure within 12 monthsPM · S. Okafor is scheduling a service window

Atlanta · Peachtree Center — Elevator bank B

Doors on floors 8–12 are closing slowly and callbacks are creeping up.

Cost of waiting
$30K emergency callout
Cost to act now
$4K service visit
Why we're flagging it
  • •4 tenant complaints in 6 weeks
  • •Last full service 14 months ago (recommended every 12)
  • •A stuck car costs 4–8× more as an emergency
Important documents · Watch list

The readings, bills and quotes behind these flags.

+ Add document
CSV
Chiller vibration readings.csv
Live feed · Dallas BMS · Today
ReadingsOpen →
PDF
Phoenix water usage 24mo.pdf
Owner · accounting · Jul 2026
UtilityOpen →
XLSX
Atlanta elevator callbacks.xlsx
PM · S. Okafor · Aug 2026
HistoryOpen →
PDF
Vendor inspection quotes.pdf
Vendor · Trane SW · Pending
QuoteOpen →