Nothing on this page needs the owner right now. You're viewing as Owner / Developer · Meridian Capital.
Buildings

Everything you own, building by building.

33 equipment records across 9 buildings · sample portfolio.

Main lobby · cars 1–3

Last inspected
Oct 14, 2025
Last repaired
Sep 2, 2026
Last tested
Oct 14, 2025
Next inspection
Oct 14, 2026
OverdueArrange the annual elevator inspection and upload the signed certificate. Continue routine maintenance.

Responsible for this equipment

L. Ortiz · Maintenance team

Warranty · Expired

Original warranty expired; service agreement on file

Service & test history

Sep 2, 2026

Repair

Adjusted door operator on car 2. Normal service restored.

Managed by L. Ortiz · Signed off by M. Carter, Northwest Elevator

Elevator door service — Sep 2026.pdf

Oct 14, 2025

Inspection

Annual inspection completed; certificate recorded by property manager.

Managed by L. Ortiz · Signed off by E. Davis, Inspection provider

Elevator inspection certificate — 2025.pdf

Oct 14, 2025

Test

Annual safety test recorded with inspection certificate.

Managed by L. Ortiz · Signed off by M. Carter, Northwest Elevator

Elevator safety test — 2025.pdf

Important documents · Cascade Union

Manuals, drawings, inspections and approvals for this building.

+ Add document
DWG
Electrical single line.dwg
Architect · Kline & Bay · 2004
DrawingOpen →
PDF
Arc flash study 2023.pdf
Engineer · NW Power · Sep 2023
SafetyOpen →
XLSX
Generator test logs.xlsx
PM · L. Ortiz · Aug 2026
HistoryOpen →
Portfolio-wide asset documents

Records that span every building.

+ Add document
XLSX
Full asset register.xlsx
System export · Today
RegisterOpen →
PDF
Warranty tracker.pdf
PM team · Aug 2026
WarrantyOpen →
ZIP
Nameplate photo library
Field techs · Ongoing
PhotosOpen →