Nothing on this page needs the owner right now. You're viewing as Owner / Developer · Meridian Capital.
Buildings

Everything you own, building by building.

33 equipment records across 9 buildings · sample portfolio.

Main panel · ground-floor security room

Last inspected
Nov 12, 2025
Last repaired
Jun 9, 2026
Last tested
Nov 12, 2025
Next inspection
Nov 12, 2026
Due soonFred to confirm the annual test appointment and attach the signed report.

Responsible for this equipment

Fred Morgan · Maintenance team

Warranty · Not on file

Warranty document not on file

Service & test history

Jun 9, 2026

Repair

Replaced faulty smoke detector on floor 6. Local test passed.

Managed by Fred Morgan · Signed off by A. Lewis, Metro Fire Services

Fire alarm service ticket.pdf

Nov 12, 2025

Test

Annual system test completed. All devices passed; signed report attached.

Managed by Fred Morgan · Signed off by A. Lewis, Metro Fire Services

Annual fire alarm test — 2025.pdf

Nov 12, 2025

Inspection

Panel, detectors and notification devices inspected with annual test.

Managed by Fred Morgan · Signed off by A. Lewis, Metro Fire Services

Fire alarm inspection — 2025.pdf

Important documents · Meridian One

Manuals, drawings, inspections and approvals for this building.

+ Add document
PDF
Annual fire alarm test — 2025.pdf
Maintenance · Fred Morgan · Nov 2025
InspectionOpen →
PDF
Chiller O&M manual.pdf
Vendor · Trane · Mar 2024
ManualOpen →
DWG
Roof plan — mechanical.dwg
Architect · Kline & Bay · Jan 2023
DrawingOpen →
PDF
Structural load letter.pdf
Architect · Kline & Bay · Aug 2026
ApprovalOpen →
XLSX
Work orders 2024–26.xlsx
PM · R. Alvarez · Aug 2026
HistoryOpen →
Portfolio-wide asset documents

Records that span every building.

+ Add document
XLSX
Full asset register.xlsx
System export · Today
RegisterOpen →
PDF
Warranty tracker.pdf
PM team · Aug 2026
WarrantyOpen →
ZIP
Nameplate photo library
Field techs · Ongoing
PhotosOpen →